Âé¶¹¹ÙÍø

Âé¶¹¹ÙÍø

SeaLhyfe Offshore Âé¶¹¹ÙÍø production platform

Location

Le Croisic, France

Starting date

2022

Production capacity

400 kg/day

Usage

Pilot platform

About SeaLhyfe

Off the coast of Le Croisic, at Centrale Nantes’ offshore pilot site, SEM-REV, Lhyfe has developed the first offshore Âé¶¹¹ÙÍø production facility in the world. Lhyfe and Central Nantes had an ambitious goal: to make offshore renewable Âé¶¹¹ÙÍø become a reality, by demonstrating the reliability of an electrolyser at sea.

The offshore pilot site met all the necessary conditions – including the presence of MREs and strict environmental criteria – to validate the offshore Âé¶¹¹ÙÍø production technology before considering large-scale industrial deployment in 2024. DNV’s energy and risk management specialists were able to carry out safety studies to identify the main risks.

This project, a real catalyst for the development of a major Âé¶¹¹ÙÍø production industry, is already supported by the Pays de la Loire Region, the Pôle Mer Bretagne Atlantique and the Comité Stratégique de Filière (CSF) des industriels de la mer.

 

Production site details

Size:

Less than 200 m2

Electrolyser:

1 MW

On-site facilities:

  • Electrolyser and Âé¶¹¹ÙÍø purification system
  • Water purification system
  • Sea water treatment unit, for pure water production and cooling applications
  • High-voltage to Low Voltage electrical transformers
  • Piping system for fitting on future Âé¶¹¹ÙÍø export pipeline
  • Offshore safety equipment and facilities
SeaLhyfe team / equipe

Find out more about our project

SeaLhyfe results

Press release

Lhyfe reviews the results of the Sealhyfe project

The objectives were met and progression to an unprecedented level of operational excellence!

SeaLhyfe at the sea

Press release

SeaLhyfe produces its first kilos of green Âé¶¹¹ÙÍø in the Atlantic Ocean

SeaLhyfe was successfully towed 20 km out into the Atlantic and connected with the SEM-REV power hub.

Opening of World's first offshore renewable Âé¶¹¹ÙÍø production pilot site SeaLhyfe

Press release

World’s first offshore renewable Âé¶¹¹ÙÍø production pilot site is inaugurated

It is to prove that it is now possible that Lhyfe is today taking on the great offshore challenge!

Related contents you might be interested in

Do you have any questions?

Explore our frequently asked questions (FAQs) and find answers to common inquiries.

Lhyfe wants to offer a more breathable world to our children and join you in a new energy paradigm.

Our purpose

Lhyfe wants to offer a more breathable world to our children and join you in a new energy paradigm.

All about green Âé¶¹¹ÙÍø - Lhyfe

Learn more about green Âé¶¹¹ÙÍø

What is green Âé¶¹¹ÙÍø and how does it work? How is green Âé¶¹¹ÙÍø produced? We answer all.

Do you want to make your green Âé¶¹¹ÙÍø project a reality?

Contact our Âé¶¹¹ÙÍø expert